Track and Turnout Renewal Neukieritzsch

Track and Turnout Renewal Neukieritzsch

Comprehensive services for the major project Neukieritzsch: track renewal, turnout renewal, civil engineering, signalling and control technology, overhead line works

Foto Neukieritzsch 4

Track and Turnout Renewal Neukieritzsch

Client:DB Netz AG
Location:Deutschland
Construction period:05/2017 - 07/2019
Executing company:Rhomberg Sersa Gleisbau GmbH
Contract value: 10,7 Mio. EUR

Project description

  • Track renewal from km 22.431 to km 28.360 and turnouts W101 + W102
  • Civil engineering: construction of formation level, PSS, TE, pipe jacking
  • Cable civil works: construction of cable ducts, cable manholes, track crossings
  • Signalling systems: installation of signals and track circuits (ESTW technology)
  • Overhead line works: installation of catenary including mast foundations, connection to existing system
  • 50 Hz systems: installation of EWHA station LNK, pumping station, platform lighting HP Deutzen
  • Structural works: culvert at km 22.891

Project scope

Project management, technical management, operational approvals, planning coordination, preparation of BAP, work preparation, coordination of all trades, obtaining regulatory permits, quality management, construction documentation, accounting, preparation of as-built documents, organization of technical and contractual approvals, VOB acceptances, work registrations, safety briefings and occupational safety, claims management.

Services

  • Quality- and deadline-compliant execution of track and cable civil works
  • Coordination of all trades
  • Support during commissioning of operational systems to ensure smooth railway operations