Project Meißnerstraße
Client: | Dresdner Verkehrsbetriebe AG |
Location: | Radebeul, Germany |
Construction period: | 05/2019 - 06/2020 |
Executing company: | Rhomberg Sersa Gleisbau GmbH |
Contract value: | EUR 1 million |
The project involved the comprehensive reconstruction of the existing road and sidewalks along 860 m as well as the installation of tram tracks (Slab Track – Rheda City system) over a length of 886 m. The construction section also included two tram stops – Dr.-Külz-Straße and Zillerstraße – which were upgraded to barrier-free accessibility as part of the works.
Project scope
- Dismantling of 800 m of twin-frame track
- Construction of 800 m of double track (Slab Track, Rheda City system)
- Installation of 2 temporary tram turnouts
- Installation of 1,800 m³ of concrete
Services
- Dismantling of 800 m of twin-frame track
- Construction of 800 m of double track (Slab Track, Rheda City system)
- Installation of 2 temporary tram turnouts