Comprehensive reconstruction of Meißnerstraße in Radebeul between Dr.-Külz-Straße and Rennerbergstraße.

Foto 1 Meißner Str

Project Meißnerstraße

Client:Dresdner Verkehrsbetriebe AG
Location:Radebeul, Germany
Construction period:05/2019 - 06/2020
Executing company:    Rhomberg Sersa Gleisbau GmbH
Contract value:EUR 1 million

The project involved the comprehensive reconstruction of the existing road and sidewalks along 860 m as well as the installation of tram tracks (Slab Track – Rheda City system) over a length of 886 m. The construction section also included two tram stops – Dr.-Külz-Straße and Zillerstraße – which were upgraded to barrier-free accessibility as part of the works.

Project scope

  • Dismantling of 800 m of twin-frame track
  • Construction of 800 m of double track (Slab Track, Rheda City system)
  • Installation of 2 temporary tram turnouts
  • Installation of 1,800 m³ of concrete

Services

  • Dismantling of 800 m of twin-frame track
  • Construction of 800 m of double track (Slab Track, Rheda City system)
  • Installation of 2 temporary tram turnouts