Framework Contract for the Maintenance of Tracks and Turnouts of LEAG

#Shortfacts

Construction period
03/2020 – 02/2021
Client
Lausitz Energie Bergbau AG
Executing companies
Rhomberg Sersa Gleisbau GmbH
Contract value
approx. EUR 4 million

Framework Contract for the Maintenance of Tracks and Turnouts of LEAG

Client:Lausitz Energie Bergbau AG
Location: 
Construction period:03/2020 – 02/2021
Executing company:    Rhomberg Sersa Gleisbau GmbH
Contract value:approx. EUR 4 million

 

Lausitz Energie Bergbau AG is an energy producer transporting lignite from 4 open-cast mines via its own rail network to 3 power plants for electricity generation. The area for which Rhomberg Sersa Deutschland was responsible covers 30 x 40 km and includes around 240 km of track, 325 turnouts, and 46 level crossings. The entire rail network is inspected at least twice a year by specialists, with deficiencies documented and priorities determined. These are reviewed again together with the client in dedicated site inspections, and measures for implementation are agreed. In addition, a 24-hour on-call service was provided to respond to potential incidents.

Project scope

  • Site setup and safety measures
  • Surveying services
  • Track and civil engineering works
  • Ballast renewal/cleaning
  • Coordination of various trades
  • Tamping works
  • Welding and grinding works

Services

  • Maintenance of tracks and turnouts
  • Sleeper replacement
  • Rail replacement
  • Ballast cleaning (subcontracted)
  • Tamping works (subcontracted)
  • Welding and grinding works
  • Works on level crossings
  • Cyclical inspection of tracks and turnouts
  • Digital condition analysis of tracks and turnouts (subcontracted)
  • Cleaning works (coal)
  • Supply of materials
  • 24-hour on-call service