Citytunnel Malmo - Slab Track
Client: | Banverket Produktion |
Location: | Malmo, Sweden |
Project time: | 09/2009 - 04/2010 |
Executing companies: | Rhomberg Sersa Bahntechnik |
Contract value: | 11 Mil. € |
The project consists of two single track tunnels with a length of 6.6km each. The slab track is constructed using a HALVT system.
The line contains two stations (Hyllie and Triangeln) and the main station Malmö C Nedre. In the northern part of the section six switches & crossings (S&C's) were installed. These form an integral part of the slab track section.
- 13.2km slab track (system HALVT)
- 10‘000m³ concrete for slab track
- 6 S&C‘s integrated into the slab track
- 6 transitions between ballast and slab track