Citytunnel Malmo - Slab Track

Slab track construction, two single track tunnels with a length of 6.6km each.

#Shortfacts

Location
Malmo, Sweden
Construction period
09/2009 - 04/2010
Client
Banverket Produktion
Executing companies
Rhomberg Sersa Bahntechnik
Contract value
11 Mil. €

Citytunnel Malmo - Slab Track

Client:Banverket Produktion
Location:Malmo, Sweden
Project time:09/2009 - 04/2010
Executing companies:    Rhomberg Sersa Bahntechnik
Contract value:11 Mil. €

 

The project consists of two single track tunnels with a length of 6.6km each. The slab track is constructed using a HALVT system.

The line contains two stations (Hyllie and Triangeln) and the main station Malmö C Nedre. In the northern part of the section six switches & crossings (S&C's) were installed. These form an integral part of the slab track section.

  • 13.2km slab track (system HALVT)
  • 10‘000m³ concrete for slab track
  • 6 S&C‘s integrated into the slab track
  • 6 transitions between ballast and slab track