Güterverkehrszentrum Hafen Deggendorf 2
Commercial Track Construction

Port of Deggendorf – Reinstallation of Track 1

#Shortfacts

Location
Deggendorf, Germany
Construction period
October – November 2020
Client
Zweckverband Donau Hafen Deggendorf

Construction of new track layout and turnout installation at the Port of Deggendorf

Client:          Zweckverband Donau Hafen Deggendorf
Location:Deggendorf, Germany
Construction period:    October – November 2020
  

 

Our assignment

  • Supply of superstructure materials
  • Installation of turnouts including adaptation to existing turnout
  • Construction of new track layout
  • Installation of a new cable duct system
  • Installation of grooved rails including asphalting works for track crossing
  • Construction of a connecting line between two floodwater pump shafts
Contact
0
Reference folder
Share reference folder
*