Port of Deggendorf – Reinstallation of Track 1

Port of Deggendorf – Reinstallation of Track 1

Güterverkehrszentrum Hafen Deggendorf 2

Construction of new track layout and turnout installation at the Port of Deggendorf

Client:          Zweckverband Donau Hafen Deggendorf
Location:Deggendorf, Germany
Construction period:    October – November 2020
  

 

Our assignment

  • Supply of superstructure materials
  • Installation of turnouts including adaptation to existing turnout
  • Construction of new track layout
  • Installation of a new cable duct system
  • Installation of grooved rails including asphalting works for track crossing
  • Construction of a connecting line between two floodwater pump shafts