Construction of new track layout and turnout installation at the Port of Deggendorf
Client: | Zweckverband Donau Hafen Deggendorf |
Location: | Deggendorf, Germany |
Construction period: | October – November 2020 |
Our assignment
- Supply of superstructure materials
- Installation of turnouts including adaptation to existing turnout
- Construction of new track layout
- Installation of a new cable duct system
- Installation of grooved rails including asphalting works for track crossing
- Construction of a connecting line between two floodwater pump shafts
Contact