Consortium Slab Track Koralm

The Koralm Tunnel forms the centerpiece of the Koralm Railway between Graz and Klagenfurt. This railway line is part of the Baltic–Adriatic Railway Corridor and reduces the travel time between the Styrian and Carinthian capitals from 3 hours to just 45 minutes.

Bild_2

Main works included

  • Installation of temporary facilities for ventilation, communication, and construction power supply
  • Construction of 65.8 km of Slab Track (Porr system), including 6.5 km as a mass-spring system (approx. 38,700 m³ of concrete)
  • Construction of a 2.0 km approach section in ballast superstructure
  • Construction of 65.8 km of service and shoulder paths (approx. 123,850 m³ of concrete)
  • Construction of 119.6 km of drainage system
  • Construction of ventilation buildings and outdoor facilities East and West
  • Completion of the East and West portals as well as the East and West portal buildings

Project services

General construction site services

  • Operation of installations
  • Establishment and dismantling of construction sites (East and West)
  • Site offices for the client (East and West)
  • Test section

Logistics and safety

  • Safety management – safety control centers
  • Logistics coordination – logistics control center

Temporary works

  • Cooling and ventilation
  • Construction communication
  • Power supply and lighting
  • Access control and personnel tracking
  • Sanitary facilities

Structural works, service and cable paths

  • Construction of central shafts
  • Installation of cable protection routes (cable ducts)
  • Construction of service and shoulder paths

Superstructure

  • Construction of Slab Track
  • Construction of mass-spring systems
  • Installation of drainage

Preparatory works for technical equipment

  • Drilling/mounting of cable support fixings

Overhead line installation works

  • Delivery/drilling/mounting of overhead line supports

Civil engineering

  • Construction of ventilation buildings East and West
  • Construction and completion of the East and West portals as well as the West portal building

Outdoor facilities

  • Construction of outdoor facilities for ventilation buildings East and West
  • Construction and adaptation of the GSA East and West
  • Works on the L145 road

Open track

  • Construction of approach sections in ballast superstructure
  • Civil engineering services