Europe’s most significant infrastructure project connects Styria and Carinthia in a whole new way.
Once the structural work was complete and the slab track had been laid, the ‘invisible nervous system’ – the highly complex technical infrastructure – was constructed and installed to ensure that safe, efficient and forward-looking operation of the high-speed line was possible in the first place.
From modern catenary and traction power systems, through sophisticated control and safety technology, to ventilation and emergency response plans.
We are setting new standards in modern European railway construction.
An overview of our services
SFE Cable Installation Services:
- ET 50 Hz, telecommunications, 110 kV power line
Power engineering:
- Construction of MV network, LV-HV and UV, electrical installation
- Illuminated handrail in the driving tunnel
- Lighting systems, cable routing in ventilation shafts, fire protection systems, cable laying in the portal area for OLA, fitting out of operations rooms at Weststeiermark station and Lavanttal station, Weststeiermark control centre
Telecommunications:
- Telecommunications technology, emergency call system, tunnel radio, fibre-optic cabling, local cabling, data network, fire alarm system, room surveillance systems, equipment for emergency stops, public address and video systems, acoustic measures
Security technology:
- Supply, handling and pulling of cables for security technology equipment and power supply to axle counters
Mechanical systems:
- Tunnel ventilation system, cross-passage ventilation/cooling, NHS waiting room ventilation, ventilation buildings, portal buildings, high-pressure water mist systems and NHS fire-fighting water systems
Structural work in the tunnel:
- Raised floors, bulkheads, cable support systems, plant room doors, NHS equipment, dry pipe system in QS