The scope of work comprised the complete data cabling of the signal box using CAT-7 and fibre-optic cables.
In addition, an emergency power supply system (EPS) for 16.7 Hz, two UPS systems with a total of 264 batteries, a redundant power supply and emergency lighting were installed.
The interior and exterior lighting for the entire site was also installed.
Furthermore, the power supply to all technical equipment was established, in particular the supply of 50 Hz alternating current and 48 V direct current to the computer cabinets.