Expansion of the Schönbuch Railway
Client: | Gottlob Brodbeck GmbH & Co. KG |
Location: | Stuttgart region, Germany |
Construction period: | 07/2017 - 12/2019 |
Executing company: | Rhomberg Sersa Deutschland GmbH |
Contract value: | 2,5 Mio EUR |
Project description
- Expansion of the Schönbuch Railway:
- Contract package VII: Böblingen depot
- Contract package VIII: Danziger Straße
- Contract package X: Extension of the platform “In der Röte”
Project scope
Electrification and partial double-tracking of the Schönbuch Railway:
- Site clearance
- Overhead line works
- High-voltage and telecommunications systems
- Signalling systems for line and level crossings
- Construction of a workshop, stabling and administration building
- Civil and structural engineering works
- Construction of new drainage systems
- Construction of new track systems outside and within the workshop
Services Rhomberg Sersa Gleisbau GmbH
- Supply and installation of 9 turnouts
- Supply and installation of approx. 2,200 m of track on concrete and Y-sleepers, including tamping, welding, and stressing works
- Installation of 3 workshop tracks with various systems, including supply and installation of a wheel load measurement system
- Construction of a measuring track
- Installation of cable troughs