To this end, the existing installations will be dismantled, two new concrete signal boxes will be erected, and the cable routes for the point mechanisms, point heating stations and catenary masts will be extended.
The heating elements and junction boxes for the points have been replaced.
In addition, the 50 Hz cabling to the signal box has been renewed.
We had to overcome a number of logistical hurdles when transporting the concrete signal box.