A high-performance 10 kV medium-voltage system with two 630 kVA dry-type transformers was newly installed in the post and luggage tunnel. The cable routes ran through the entire station.
Construction took place ‘whilst the station remained in operation’. Only specific sections were closed off, or the platform currently undergoing refurbishment.
The successful completion of the project was made possible by the focused cooperation of all those involved, as well as by pragmatic solutions.