Komplex Bahnhof Rathen
Commercial Track Construction

Complex Rathen Station

#Shortfacts

Location
Rathen, Germany
Construction period
10 - 12/2016
Client
DB Netz AG
Executing companies
Rhomberg Sersa Gleisbau GmbH
Contract value
EUR 4.6 million (own share: EUR 2.6 million)

Complex Rathen Station

Client:DB Netz AG
Location:Rathen, Germany
Construction period:10 - 12/2016
Executing company:    Rhomberg Sersa Gleisbau GmbH
Contract value:EUR 4.6 million 
(own share: EUR 2.6 million)

Project description

This project involved the renewal of tracks and turnouts on line 6240 between Neustadt station and the German/Czech border. As a trans-European line, the track is used by both national and international freight and passenger traffic. Damage to the railway infrastructure caused by the flood events of 2002 and 2013 made renewal works necessary. In cooperation with Hentschke GmbH, 8 turnouts, 2,877 m of track, and two double-track railway bridges (EÜ) were renewed in Rathen. In addition, one turnout and a logistics track were newly constructed, and a logistics track was extended by 180 m.

Project scope

  • New construction of 514 m of track
  • Renewal of 2,877 m of track
  • New construction of 1 turnout
  • Renewal of 8 turnouts
  • Ballast renewal
  • Level crossing works
  • Cable civil works
  • Installation of formation protective layer (PSS)
  • Construction of shunting and logistics tracks
  • Renewal of 2 railway bridges (EÜ)
  • Renewal of culvert
  • Tamping works
  • Welding works
  • Asphalt works

Services Rhomberg Sersa Gleisbau GmbH

  • New construction of 514 m of track
  • Renewal of 2,877 m of track
  • New construction of 1 turnout
  • Renewal of 8 turnouts
  • Cable civil works
  • Level crossing works