Homepage
References
Trachenberge Depot: Expansion 2018

Trachenberge Depot: Expansion 2018

Track and Civil Works

Trachenberge 2018

Trachenberge Depot: Expansion 2018 – Track and Civil Works

Client:Dresdner Verkehrsbetriebe AG
Location:Dresden
Construction period:04 - 11/2018
Executing company:    Rhomberg Sersa Deutschland GmbH
Contract value:Auftrag ARGE: 2,9 Mio EUR
Eigenanteil: 895.000,- EUR

As part of the 2009 expansion stage, DVB AG planned the complete reconstruction of the track facilities. The works included the renewal of tracks 12–19, partial renewal of 12 turnouts at the southern exit fan, construction of a new track connection, and the erection of a railport. Additionally, the road surfacing as well as the overhead line, drainage, traction power, telecommunications, turnout control, turnout heating, low-voltage, and lightning protection systems were adapted. Green areas were also created.

Project scope

  • Coordination of various trades and third parties
  • Site setup and clearance
  • Site safety
  • Coordination of traffic safety and traffic management
  • Surveying services
  • Marking works
  • Power shutdowns
  • Demolition works
  • Building waterproofing
  • Earthworks, track, and road construction
  • Dismantling and reconstruction of drainage systems
  • Civil engineering works for overhead line, traction power, telecommunications, low-voltage, medium-voltage, and lightning protection systems
  • Track welding works
  • Construction of road and track surfacing in asphalt, concrete, and partly paving stones
  • Installation of bituminous joints on rails
  • Tree felling works
  • Landscaping works
  • Fence construction works
  • Disposal services

Services Rhomberg Sersa Gleisbau GmbH

  • Renewal of 3,220 m of single track Slab Track, Rheda City system (DVB AG type), including associated works
  • Renewal of 160 m of sleeper track, including associated works
  • Renewal of 450 m of grooved rail systems, Slab Track, Rheda City system (DVB AG type), including associated works
  • Construction of 12 single turnouts and one double turnout connection (2 EWs), Slab Track Rheda City system (DVB AG type), including associated works
  • Conversion of 3 single turnouts in ballast, including associated works
  • Dismantling and construction of rail drainage boxes

 

Subcontracted works

  • Concrete works
  • Surveying services
  • Welding works (360 units)
  • Dismantling and reconstruction of all electrical connections