ABS Dresden - Berlin, PA5 Kottewitz - Großenhain

ABS Dresden - Berlin, PA5 Kottewitz - Großenhain

ABS Dresden -Berlin, PA5 Kottewitz-Großenhain

ABS Dresden - Berlin, PA5 Kottewitz - Großenhain

Client:DB Netz AG
Location:Großenhain, Deutschland
Construction period:12/2016 - 12/2017
Executing company:       Rhomberg Sersa Gleisbau GmbH
Contract value:EUR 24 million 
(own share EUR 1.5 million)

 

As part of this project, two tracks each 3.8 km in length were dismantled and rebuilt 4 m offset for a design speed of 160 km/h. The works were carried out in conventional construction. Special features of the Großenhain project included the dismantling of 5 bridge structures, laying of 4 km of cable route, and full-length reconstruction with subgrade, frost protection layer, and formation protective layer.

 

Project scope

  • Track construction (ballasted superstructure): dismantling of approx. 4 km of double track, reconstruction offset by 4 m, dismantling and reinstallation of a 500 turnout
  • Associated track works
  • Dismantling and installation of level crossings using large precast reinforced concrete slabs
  • Cable civil works
  • Logistics
  • Installation of mineral formation protective layer (PSS)
  • Ballast cleaning/renewal
  • Tamping and lining works
  • Ultrasonic testing
  • Welding works, stress relief, grinding works
  • Track surveying

Services Rhomberg Sersa Gleisbau GmbH

  • Track construction (ballasted superstructure): dismantling of approx. 4 km of double track, reconstruction offset by 4 m, dismantling and reinstallation of a 500 turnout
  • Associated track works
  • Dismantling and installation of level crossings using large precast reinforced concrete slabs
  • Cable civil works