ABS Dresden - Berlin, PA5 Kottewitz - Großenhain
Client: | DB Netz AG |
Location: | Großenhain, Deutschland |
Construction period: | 12/2016 - 12/2017 |
Executing company: | Rhomberg Sersa Gleisbau GmbH |
Contract value: | EUR 24 million (own share EUR 1.5 million) |
As part of this project, two tracks each 3.8 km in length were dismantled and rebuilt 4 m offset for a design speed of 160 km/h. The works were carried out in conventional construction. Special features of the Großenhain project included the dismantling of 5 bridge structures, laying of 4 km of cable route, and full-length reconstruction with subgrade, frost protection layer, and formation protective layer.
Project scope
- Track construction (ballasted superstructure): dismantling of approx. 4 km of double track, reconstruction offset by 4 m, dismantling and reinstallation of a 500 turnout
- Associated track works
- Dismantling and installation of level crossings using large precast reinforced concrete slabs
- Cable civil works
- Logistics
- Installation of mineral formation protective layer (PSS)
- Ballast cleaning/renewal
- Tamping and lining works
- Ultrasonic testing
- Welding works, stress relief, grinding works
- Track surveying
Services Rhomberg Sersa Gleisbau GmbH
- Track construction (ballasted superstructure): dismantling of approx. 4 km of double track, reconstruction offset by 4 m, dismantling and reinstallation of a 500 turnout
- Associated track works
- Dismantling and installation of level crossings using large precast reinforced concrete slabs
- Cable civil works