Citytunnel Malmoe - Slab Track

Slab track construction, two single track tunnels each having a length of 6.6 km.

Citytunnel Malmö_Feste Fahrbahn_1

Citytunnel Malmoe - Slab Track

Client:

Banverket Produktion

Location:

Malmoe, Sweden

Project time:

09/2009 - 04/2010

Executing companies:

Rhomberg Bahntechnik

Contract value:

11 Mio. €

 

The project entails two single track tunnels each having a length of 6.6km. The slab track is constructed with the HA­LVT
system.

The line contains two stations (Hyllie and Triangeln) and the main station Malmö C Nedre. In the northern part of the section six Switches & Srossings (S&C's) were installed. These form an integral part of the slab track section.

  •  13.2 km slab track (system HA­LVT)
  • 10‘000 m³ concrete for slab track
  • 6 S&C‘s integrated into the slab track
  • 6 transitions between ballast and slab track